Healthcare
Norton Healthcare's Pre-Fabricated Interior Solutions
The Norton Cancer Institute built in 2019 located at Brownsboro Road location. This project included a mix of Herman Miller Millwork installed on DIRTT prefabricated interiors. Utilizing these solutions, ID+A was able to reduce trades on-site and speed up the interior construction timeline.